It was 2022 when Karl rolled up his sleeves and built ‘The Cube’ as it is known!

We spent hours out here and dreamed about being able to use the Summer House for preparing food and drinks (and going to the toilet!). So a couple of months down the line and Karl started turning his hand to putting up a stud wall for a bathroom in the Summerhouse.

After a tentative start and lots of YouTube videos and me as a ‘mate’ this happened:



Leave a comment